Access Authorization

Access authorization

An access authorization is issued after successfully completing the safety instructions at the GENDORF Chemical Park. The type of access authorization depends on the intended length of stay.

  • Visitors (customers, lecturers, auditors)
    These are given a visitor ID by site security. The same applies to tradesmen and mechanics from contractors who are on the site grounds for no more than two days.
  • Truck drivers
    Truck drivers who only need access to the site for one day can receive a day pass.
  • Tradesmen and service providers (3 days and longer)
    A free contractor ID without photo is issued for a length of stay from three up to a maximum of four weeks. A contractor photo-ID (fee-based) is required for a length of stay of more than four weeks.

Note: a vehicle pass is required to enter the site grounds with a motor vehicle. Entering motor vehicles must be reported to, and registered by site security. More related information is found under GIMS Section 8.1.

Downloads